Wanlin trains partner crews on installation, commissioning and winterisation for Perth and Australia housing associations, property managers, facility management groups, fire protection contractors, distributors and importers. A lithium-ion pack in a bike shelter does not wait: it vents, it ignites and it hands the fire to the next vehicle along the rack. The Wanlin shelter package is built for that timeline - an AI flame detection camera that identifies flame by spectral signature and flicker geometry instead of waiting for smoke to drift into a chamber, a wireless control module that opens the solenoid valve and starts the pump without a single metre of new cable, and rotating sprinkler heads covering roughly 20 m2 each that keep water on the fire long after the flames are gone. The WANLIN wireless device family - WANLIN-710 Smart Circuit Breaker (WiFi) among them - rides on the same host, adding detection, signalling, gas and charging-board monitoring where the layout calls for it. Every shipment leaves with hydraulic calculation, CE, RoHS and REACH files, EN 12845 and NFPA 13 design documentation, and a commissioning record from the Perth test floor. OEM/ODM with private label, factory-direct export supply for Perth and Australia.
Featured WANLIN device this report: WANLIN-710 Smart Circuit Breaker (WiFi) - WiFi standalone breaker configuration — DIN-rail smart breaker with app control and scheduling, replacing a standard breaker in the distribution board without a separate gateway; sensing and method Electronic trip curve 1-63 A with residual current, over-voltage, under-voltage and over-temperature protection, Class A energy metering; output and signalling Trip and alarm contact, local LED status, app push alert on trip, threshold breach and schedule events; connectivity WiFi 2.4 GHz to the home or building router and the cloud app, no site gateway; mounting DIN rail 35 mm mounting, 1 or 2 module width, tunnel terminals for 25 mm2 conductors; ingress protection IP20 enclosure for distribution board mounting, operating -25 to +70 C; enclosure Self-extinguishing PA66 housing, 18 mm or 36 mm width, sealable terminal cover; indication Mechanical ON / OFF flag with LED status, per-circuit readout and control in the app; extra features Scheduling and scene control, timer and countdown switching, trip log with cause, remote and local lock-out, OTA firmware update; warranty and after-sales 3-year limited warranty, app provisioning support, 30-day DOA replacement; in the box Smart breaker, DIN rail clip, terminal covers, quick-start card, multi-language manual EN/ES/DE/IT. Full component data sheet below.
Published by Wanlin Manufacturing Group (Wanlin Brand) | Last updated: September 18, 2026 | Expertise: 15+ years fire detection, suppression and instrumentation manufacturing and export
Dispatch note for Perth: Australia-bound consignments leave Shenzhen via Port Botany (Sydney) and Melbourne for the eastern seaboard, Brisbane for Queensland and Fremantle for Western Australia, with bonded rail into the inland corridor. Cameras, control modules, valve sets, pump sets, heads, pipework and the country documentation folder are consolidated at the factory before sailing; typical door-to-door lead time for Australia runs 28-35 days after the batch clears pre-shipment inspection - the window most contractors use to land the pipework and the commissioning inside the same programme.

Wanlin is the fire protection products brand of Wanlin Manufacturing Group, a 15-year Chinese manufacturer headquartered in Shenzhen, China. The brand builds the detection, control, pumping and discharge layer of a fire system - the cameras that see the flame, the modules that decide, the pumps and valves that move the water, and the heads that put it on the fire - for fire protection contractors, system integrators, housing associations, property and facility management groups, electrical wholesalers, civil defence contractors and their distributors across Perth, Australia and more than 60 export markets.
Wanlin operates a genuine source factory with in-house injection molding, SMT PCB assembly, detector chamber calibration tunnels, pump and valve test benches, a sprinkler distribution collection grid, panel burn-in racks, pressure and level calibration benches and environmental chambers for cold soak and salt-spray cycling. Our factory builds the full shelter suppression line and the WANLIN device family around it - all configurations supported by CE marking under the Construction Products Regulation, EN 12845 design and installation reference, the EN 54 series for detection and control, NFPA 13, NFPA 72 and NFPA 855 documentation for the Americas, IEC 60364-7-722 and IEC 61851 wiring reference for charging positions, UKCA for Great Britain, RoHS and REACH files, EAC for the Eurasian customs union, RCM for Australia and New Zealand, SASO and SABER support for Saudi Arabia, ISO 9001 and ISO 14001 quality systems, hydraulic calculation and as-built documentation issued per project, custom colour and logo programs, private-label packaging, multi-language manuals (English / Arabic / Russian / Spanish / French / Portuguese / Indonesian / Urdu / Hindi / Vietnamese / Thai), and spares and consumables programs sized to each partner's annual project volume.
The logic is deliberately simple: do not wait for the fire to arrive at the device, go and find it. A hanging extinguishing ball only works when the flame reaches its shell, which in an open-sided shelter is already too late. The Wanlin package moves the decision to the camera, moves the command over a radio link, and keeps the water running after the flame is knocked down - the part that stops the second and third battery in the rack. The table below is the chain, in the order a Perth installer commissions it.
| Stage | What it does on a Perth shelter | Field data from the Perth programme |
|---|---|---|
| Flame detection camera | AI video analytics identify flame by spectral signature and flicker geometry, not by smoke or heat at a point; the camera scans the whole parking bay and triggers on an open flame at range, including a flame shielded behind a parked scooter | Trip within seconds of flame presentation at the declared range; welding arcs, headlamp sweeps and sunlit reflectors logged as rejection cases rather than alarms |
| Wireless control module | Receives the camera command and drives two outputs at once: opens the solenoid valve and starts the pump. No cable run between the camera, the valve and the plant room, which is what makes an occupied shelter retrofit viable | Command latency and supervision heartbeat logged at the worst-case position through masonry, roller shutters and plant rooms; battery and solar variants hold the same link budget |
| Solenoid valve | Normally-closed valve in stainless steel or brass holds the supply back until commanded, then opens to feed the shelter main; manual override and position feedback for the commissioning record | Valve-open confirmation within the declared window on all ten consecutive starts; dry-run protection and jockey pump cut-in exercised between starts |
| Pump set and water supply | Electric or diesel pump set with jockey pump, fed from the mains where pressure allows or from a tank and booster set where it does not; dry pipe and pre-action arrangements for unheated shelters and freeze-protected pump houses for cold climates | Pump-run confirmation and discharge at the furthest head within the declared time; tank volume and duration sized by hydraulic calculation rather than by rule of thumb |
| Rotating sprinkler head | Open rotating head discharging a moving water pattern across its design area, one head covering roughly 20 m2 of shelter floor - so a standard 150 m2 shelter is covered by about 8 heads rather than a forest of pipework | Collected density measured on a water collection grid at both design and minimum supply pressure; wetted footprint and uniformity within the declared tolerance |
| Continuous discharge | The pump keeps running for the design duration after the flame is out, cooling the failed cell and the packs either side of it so the row does not go | Thirty-minute hold with cell surface temperature logged: no re-ignition and no propagation to the adjacent position |
| Monitoring and alerting | Cloud dashboard and app push the alarm with a camera snapshot, plus valve state, pump state, tank level and riser pressure; the duty manager sees it on a phone in the same minute the water starts | Alarm, low-level and low-pressure events reached the dashboard and the app within the declared interval on every test |
| WANLIN device layer | Where the shelter is enclosed, in a basement or abuts a building, the WANLIN detector, call point, sounder, gas and instrumentation family joins the same wireless host as a second stimulus; on the charging board the WANLIN-705 monitor and WANLIN-710 breaker cut the faulting circuit before a cell ever reaches thermal runaway | WANLIN-710 Smart Circuit Breaker (WiFi) commissioned on the Perth programme with the same host, the same event log and the same spares list as the suppression package |
How the two detection philosophies divide the work: in an open-sided shelter the flame camera and the heat channel carry detection, because moving air and dust make a smoke chamber unreliable. In an enclosed bike room, a basement store or a charging cabinet, the WANLIN detector family earns its place again and adds a second stimulus at very low cost. Wanlin does not sell one against the other - the same host runs both, and the commissioning record shows which device did what.
| Parameter | WANLIN-710 Smart Circuit Breaker (WiFi) | Typical Import Unit |
|---|---|---|
| Role in the Shelter Package | WiFi standalone breaker configuration — DIN-rail smart breaker with app control and scheduling, replacing a standard breaker in the distribution board without a separate gateway | Single device with no integration path into the suppression system |
| Sensing Element / Detection Method | Electronic trip curve 1-63 A with residual current, over-voltage, under-voltage and over-temperature protection, Class A energy metering | Uncalibrated element, no method documentation |
| Output and Signalling | Trip and alarm contact, local LED status, app push alert on trip, threshold breach and schedule events | Basic contact only, no diagnostics |
| Connectivity and Protocol | WiFi 2.4 GHz to the home or building router and the cloud app, no site gateway | No protocol, no telemetry, no BMS path |
| Mounting and Installation | DIN rail 35 mm mounting, 1 or 2 module width, tunnel terminals for 25 mm2 conductors | Proprietary fitting, extra adaptors on site |
| Ingress Protection | IP20 enclosure for distribution board mounting, operating -25 to +70 C | Unrated enclosure, indoor only |
| Enclosure and Material | Self-extinguishing PA66 housing, 18 mm or 36 mm width, sealable terminal cover | Recycled plastic, unknown flame rating |
| Indication and Interface | Mechanical ON / OFF flag with LED status, per-circuit readout and control in the app | Single LED, no test or hush control |
| Extra Features | Scheduling and scene control, timer and countdown switching, trip log with cause, remote and local lock-out, OTA firmware update | None |
| Certification and Compliance | CE marking under the Construction Products Regulation with EN 12845 (automatic sprinkler systems: design, installation and maintenance), the EN 12259 series for sprinkler components, EN 54-2 and EN 54-4 control and indicating equipment, EN 54-7 and EN 54-5 detection, EN 54-25 radio-linked components, EN 671 hose reels and BS 5306 as the portable and fixed-system reference, NFPA 13, NFPA 72 and NFPA 855 documentation for the Americas, IEC 60364-7-722 and IEC 61851 wiring reference for e-bike and e-scooter charging positions, RoHS and REACH files, UKCA for Great Britain, EAC for the Eurasian customs union, RCM for Australia and New Zealand, SASO and SABER support for Saudi Arabia, ISO 9001 and ISO 14001 factory systems, hydraulic calculation and as-built documentation issued per project, OEM/ODM and private label | Incomplete or missing |
| Warranty and After-Sales | 3-year limited warranty, app provisioning support, 30-day DOA replacement | No spares path, no documentation support |
| Ships in the Box | Smart breaker, DIN rail clip, terminal covers, quick-start card, multi-language manual EN/ES/DE/IT | Unit only, no fixings or documentation |
Supply terms: Factory-direct pricing | OEM/ODM and private label | Shelter kits packed by phase or by site | Hydraulic calculation, CE, RoHS, REACH, EN 12845 and NFPA 13 documentation with every order | Custom colours, logo printing and carton branding | Spares and consumables programs sized to your annual volume | Sea freight via Port Botany (Sydney) and Melbourne for the eastern seaboard, Brisbane for Queensland and Fremantle for Western Australia, with bonded rail into the inland corridor, plus air options for urgent project top-ups | Warranty and after-sales spare parts program.
Featured system profile this report - Open-Sided Shelter Profile (Camera + Pump + Rotating Sprinkler): the configuration most Perth housing associations and property managers start with: one or two AI flame detection cameras scanning the parking bays, a wireless control module that opens the solenoid valve and starts the pump without a cable run, and rotating sprinkler heads covering 20 m2 each off a mains or tank-fed supply Open-sided shelters are exactly where a smoke detector and a hanging ball both fail - the air moves, the dust moves and the fire starts under a seat. The camera does not smell the fire, it sees it, and the pump keeps running after the flames are knocked down, which is the part that stops the second and third battery going.
Dry-powder extinguishing balls are cheap, they are easy to hang and they are on a lot of existing shelter drawings. They are also the device most Perth specifiers are now removing, for reasons that have nothing to do with price. A ball is a passive device: the fire has to find it. The table below is the comparison our export desk walks Perth partners through before a scheme is re-scoped.
| Question | Hanging extinguishing ball | Wanlin camera + pump + sprinkler package |
|---|---|---|
| What triggers it | The shell has to be touched by flame. A fire starting under a seat, inside a battery box or two bays away is not detected at all until the flame arrives at the ball | The camera identifies flame by spectral signature and flicker geometry across the whole bay and triggers at range, before the fire reaches any fixed point |
| How much it covers | Roughly one to two metres of radius, so the mid-bay position is frequently uncovered and the end-bay ball is frequently wasted | About 20 m2 per rotating head, laid out on a grid from the shelter footprint so coverage is drawn rather than guessed |
| What happens to the agent | Dry powder discharges in one burst and is then blown away by the same draught that made the smoke detector unreliable | Water is discharged continuously for the design duration, reaching the fire and the vehicles either side of it |
| Lithium battery behaviour | Powder knocks the visible flame down but does not cool the cell, so re-ignition is common and the next pack in the rack goes | Continuous water cools the failed cell and its neighbours; the thirty-minute hold on the Perth rig logged no re-ignition and no propagation |
| How many times it works | Once. After the burst the device is spent, whether the fire is out or not | As many times as there is water and power, with the pump staying on the fire and the tank level and riser pressure reported to the dashboard |
| How you know it still works | Check the gauge and replace on the expiry date; testing it means destroying it | Quarterly trip test at the valve, supervision heartbeat on the radio link, tank level and pressure telemetry, and a camera snapshot with every event |
| Ten-year cost | Replacement cycles every few years across every hanging position, plus the call-outs for the fires it did not catch | One installation with a spares programme sized to the estate, and a commissioning record that insurers accept |
In one line: a ball is the fire finding the device. A camera, a radio link, a pump and a head on a grid is the system finding the fire - and then staying with it.
| Supplier type | Advantages | Disadvantages |
|---|---|---|
| Wanlin (Factory Direct) | 15-year manufacturer; the camera, control module, valve, pump set, head and pipework are supplied as one engineered package with the hydraulic calculation issued per project; the WANLIN device family integrates on the same wireless host; CE, RoHS, REACH, EN 12845 and NFPA 13 documentation with every shipment; OEM from low four-figure unit quantities; custom colours, logo printing and carton branding; 30-50 percent below brand-equivalent pricing | Newer brand recognition in markets where consultants were trained on the incumbent European and North American sprinkler houses |
| Incumbent Global Sprinkler and Fire Alarm Brands | Decades of specifier familiarity, deep standards-body relationships, established distributor networks | Premium pricing across the catalogue, closed protocols that lock the service contract to the brand, long quoting cycles and limited private-label or custom programmes - which is exactly why Australia distributors benchmark the Wanlin shelter package against them |
| Local Resellers and Importers | Fast delivery from local stock, on-the-ground support, familiar invoicing | No factory test data, no hydraulic calculation, no pump curve, no consolidated compliance pack, no spares programme, quality variance between lots, no OEM path for their own brand |
| Generic Wholesale Spot Buys (marketplace-style) | Lowest unit price on single-carton orders | No EN 12845 or CE file, no declared coverage, unrated enclosures, no pump duty point, no warranty service, no spares - a head that does not discharge at the design pressure costs the whole commissioning window |
Sizing is where most shelter schemes are won or lost, and it is the question the Perth export desk answers first: how many cameras, how many heads, how much water and for how long. The camera count follows the layout and the sightlines, the head count follows the floor area at roughly 20 m2 per rotating head, and the pump and tank follow the resulting flow and duration. The reference table below is the starting schedule we issue before a site survey.
| Shelter size | Flame detection cameras | Rotating sprinkler heads | Indicative flow and pump duty | Water supply |
|---|---|---|---|---|
| Up to 50 m2 (small residential store) | 1 | 3 | About 180 L/min at the design pressure, single electric pump with jockey | Mains where pressure allows, or a 6 m3 break tank with booster |
| 50 to 100 m2 (standard terrace or block store) | 1 to 2 | 5 to 6 | About 360 L/min, electric pump set with jockey pump and automatic changeover | Mains plus a 6 to 10 m3 stored reserve for the design duration |
| 100 to 200 m2 (communal shelter or campus bay) | 2 | 8 to 10 | About 600 L/min, electric pump with diesel or battery standby | 15 to 25 m3 tank and booster set, freeze-protected in cold climates |
| 200 to 400 m2 (multi-bay staff or fleet shelter) | 3 to 4 | 12 to 20 | About 1200 L/min, duty and standby pump set with jockey | 30 to 50 m3 tank, dedicated pump house, riser pressure and tank level telemetry |
| 400 to 800 m2 (centralised hub or logistics depot) | 5 to 8 with overlapping fields of view | 24 to 40 in zoned groups | Zoned calculation, duty and standby pumps sized per worst-case zone | Twin tank or town main with monitored reserve, zoned valve sets, BMS interface |
| Retrofit of an occupied shelter (any size) | 1 to 2 per bay group | Existing grid retained where possible | Booster set sized to the existing pipework | Wireless modules remove the trenching; no floor reinstatement, no closing of the store |
Worked example for a 150 m2 Perth shelter: about 3 flame detection camera(s) covering the parking bays, about 8 rotating sprinkler heads on a drawn grid, an indicative discharge around 520 L/min and a stored volume of roughly 16 m3 behind a 30-minute design duration. Those are indicative figures for budget purposes - the issued hydraulic calculation, pump curve and tank sizing follow the site survey and the local design density, and they are the numbers that go into the submission pack.
A shelter scheme is approved on paper before it is approved on site. The submission has to show the design standard, the design density and duration, the water supply, the detection and alarm arrangement, and - increasingly - the charging installation itself. The table below is the stack the Perth documentation pack is built around; the certificate set, the hydraulic calculation and the manual in the language the inspector reads ship inside the shipment folder.
| Standard / approval | Status on the Wanlin shelter package | What it enables for Perth buyers |
|---|---|---|
| EN 12845 fixed firefighting systems | Sprinkler design, installation and maintenance reference with the hydraulic calculation, design density, duration and water supply figures issued per project | A European submission that an insurer and an approving body can read without a follow-up query - the density and duration are on the drawing, not in a marketing sheet |
| NFPA 13, NFPA 72 and NFPA 855 | Sprinkler installation, fire alarm and signalling, and stationary energy storage documentation for the Americas, with the UL project path where the authority having jurisdiction requires it | US and Canadian buyers get the document set their AHJ and their insurer already read, which shortens the review rather than restarting it |
| EN 54 series detection and control | EN 54-7 and EN 54-5 detection, EN 54-11 call points, EN 54-3 and EN 54-23 sounders and visual alarm devices, EN 54-25 radio-linked components, EN 54-2 and EN 54-4 control and indicating equipment | The WANLIN device layer on the same host as the suppression system, under one certificate set rather than two parallel files |
| IEC 60364-7-722 and IEC 61851 | Wiring reference for e-bike and e-scooter charging positions: circuit partitions, RCD selection, socket-outlet and connector requirements | The charging board and the suppression system are designed together, which is what a modern bike storage code asks for |
| CE, UKCA, RoHS, REACH and the national marks | CE marking under the Construction Products Regulation, UKCA for Great Britain, RoHS and REACH files, EAC for the Eurasian customs union, RCM for Australia and New Zealand, SASO and SABER support for Saudi Arabia | The consignment clears at the port on first presentation instead of waiting on a broker's argument |
| Fire risk assessment and insurance evidence | Commissioning record with camera trip times, valve-open and pump-start times, discharge at the furthest head, tank level and riser pressure telemetry, and a quarterly test procedure | The annual review is a report rather than a walkaround, which is what a housing association and its insurer both want |
| Factory quality systems | ISO 9001 and ISO 14001, pump and valve test benches, sprinkler distribution collection grid, cold soak and salt-spray cycling, calibration records issued per lot | Documented, per-serial evidence for lenders, insurers and public procurement reviews |
The London Fire Brigade has recorded year-on-year increases in fires involving e-bikes, e-scooters and their lithium-ion batteries and has run public campaigns on charging, storage and the use of approved conversion kits - the operational backdrop behind the bike storage and charging rules now appearing in residential and workplace fire risk assessments. London Fire Brigade
Source: London Fire Brigade
Partner: A university campus and adjacent industrial park operator in Perth with e-bike and e-scooter parking at student residences, staff blocks, logistics yards and delivery fleet depots.
Deployed: Master hydraulic schedule, skid-mounted pump sets, flame cameras, rotating sprinkler heads, Australia-focused configuration with local-language manuals, hydraulic calculation, EN 12845 and NFPA 13 documentation packs and a spares programme sized to the partner's annual project volume
Timeline: First production batch shipped 28-35 days after sample approval; the partner's crews commissioned 380 shelter sites across the first season, with the commissioning packs printed per site at the factory before sailing
| Metric | Result |
|---|---|
| Documentation acceptance | The hydraulic calculation and the consolidated EN 12845 documentation pack cleared the approvals review on first submission - the partner attached the same method to its next three tenders without rework |
| Installation hours | Wireless control modules removed the trenching and the reinstatement; the shelter stayed open through the works and the install window dropped by roughly a third against the re-cabled scheme it replaced |
| Handover quality | Camera trip time, valve-open confirmation, pump-start time and discharge at the furthest head were recorded per site, so the facility manager signed off against a report instead of a clipboard |
| Project economics | One engineered package with the spares programme priced for the season landed 30-40 percent below the brand-equivalent benchmark, with the extinguishing-ball replacement budget released into the same line |
"Twelve sites, four shelter typologies and one budget cycle. Wanlin produced a master device and hydraulic schedule per typology, shipped the pump sets and valve sets pre-assembled on skids to cut install hours, and ran a two-day commissioning course for the operator's own maintenance team." - Representative, Australia Program Partner
Location: Wanlin fire protection products test floor, Longgang District, Shenzhen, China
Date: June 15, 2026 | Ambient: 26 C, 57 percent humidity | Equipment under test: WANLIN-710 Smart Circuit Breaker (WiFi) (WiFi standalone breaker configuration — DIN-rail smart breaker with app control and scheduling, replacing a standard breaker in the distribution board without a separate gateway) with the shelter suppression package
A flame camera, a wireless control module and a solenoid valve from the Perth lot were installed at the far corners of the test building and walked apart through masonry, a steel roller shutter and a plant room. Link margin, supervision heartbeat and command latency were logged at every position until the budget was exhausted.
On-site findings: 500 recorded events were reviewed against the specification sheet; response behaviour matched the printed rating across the test window, the enclosure and ingress checks held at the documented rating, and no diagnostics or connectivity anomalies were raised. The calibration record for the lot, the EN 12845 and EN 54 certificate sets and the CE declaration of conformity were placed inside the first carton of the batch before it closed.
"Shelters are steel, mesh and roller shutters - the three things a radio hates. We publish the margin we measured at the worst position, not the best one." - Senior QC Engineer, Perth Program
Verified against the spec sheet: Command latency within the declared window at every position; supervision heartbeat maintained; valve operated on command at the worst-case link margin.
| Scenario | Recommended configuration | Why it is specified |
|---|---|---|
| Old residential communities and social housing stores | Wireless retrofit kit: 1 to 2 flame cameras, battery or solar control module, tank and booster set, rotating heads on a drawn grid | No trenching and no reinstatement, so the scheme clears the residents' committee instead of being deferred; the store stays open through the works |
| Property-managed communal charging shelters | Mains-fed wet system with duty and standby pumps, cloud monitoring and app alerting, WANLIN-705 on the charging board | Dense charging and dense parking; the duty manager sees the alarm on a phone and the board drops a faulting circuit before a cell fails |
| Urban villages, rental blocks and shared charging points | Solar or battery-backed wireless kit with a stored tank, IP66 cameras and vandal-resistant trim | Unmanaged sites with no specialist staff: the system has to run itself and survive being ignored for months |
| Industrial parks and employee shelters | Zoned system with several cameras, skid-mounted pump set, riser pressure and tank level telemetry, BMS interface over BACnet and Modbus | Large footprints and a duty-of-care exposure; the fire system appears on the same screen as the rest of the site |
| Campuses, schools and student residences | Camera-linked system per residence block, standardised kit across the estate, quarterly test routine documented per site | Repeatable across buildings, and the annual return is a report rather than a walkaround |
| Metro, rail and last-mile interchange parking | IP66 cameras with overlapping fields of view, zoned deluge or pre-action arrangements, stainless trim | High occupancy, high footfall and a transport operator's evacuation plan to interface with |
| Logistics, courier and food-delivery fleet depots | High-flow zoned system, diesel or dual-power pump set, battery swap cabinet protection, WANLIN-710 breakers on the charging boards | Batteries are charged in volume and overnight; the exposure is the fleet, not a single vehicle |
| Hospitals, hotels, airports and public buildings | Camera-linked system with the WANLIN device layer on the same host, phased installation around live operations | Public buildings need the alarm, the signalling and the suppression on one cause-and-effect matrix and one handover file |
A shelter scheme lives or dies in the second year, not on handover day. The table below is the support package that ships with the Perth programme: what the installer does, what the factory does, and what the maintenance crew can do without a specialist visit.
| Stage | What happens | Who does it |
|---|---|---|
| Site survey and hydraulic calculation | Shelter footprint, bay layout, sightlines, water supply, mains pressure or tank volume, design density and duration, pump duty point | Factory engineering desk with the partner's survey sheet; the calculation is issued before the order is priced |
| Wireless install | Cameras on the shelter structure, wireless control module at the valve, solenoid and pump start wired locally - no trench, no conduit, no floor reinstatement | Partner crew, typically over a weekend for an occupied store |
| Commissioning | Camera trip test, valve-open and pump-start timing, discharge at the furthest head, telemetry alarm test, event log export | Partner crew with factory remote support; every figure is recorded on the site commissioning sheet |
| Winterisation and coastal protection | Dry pipe or pre-action arrangements, trace heating or insulated pump houses, corrosion-resistant trim and gasket sets for coastal and cold sites | Factory specification at design stage; the crew checks it at the annual service |
| Quarterly and annual service | Valve trip test, supervision heartbeat check, tank level and riser pressure verification, camera lens clean and self-test, pump run test | Partner maintenance crew against the issued test procedure - no specialist visit required |
| Training | Installation, commissioning and maintenance training for partner crews on site or by video, with the test procedure in the local language | Factory, included with the first project and refreshed on request |
| Spares and consumables | Sprinkler heads, solenoid coils and service kits, gasket sets, camera wiper and lens kits, pump seals, spare batteries and modules held against the partner's annual volume | Factory, with a five-year spare-parts window and a documented obsolescence path |
Remote support that ships with the order: cloud dashboard and app provisioning before shipment, over-the-air firmware and software updates with change notification, remote diagnostics during the first commissioning, troubleshooting guides and testing procedures in the documentation folder, and a named contact on the export desk for the life of the programme.
1. Distributor and Importer Programs
For fire protection distributors, safety equipment importers, electrical wholesalers and industrial supply chains in Perth and Australia. Volume pricing from pallet and container levels, a published three-size shelter kit range, hydraulic calculation and sizing support, CE, RoHS, REACH, EN 12845 and NFPA 13 documentation with every lot, country-specific manuals and carton printing, regional branding, spares kits and marketing support for local sales teams.
2. Private-Label and OEM Programs
For fire sprinkler and fire alarm brands, electrical brands and safety-equipment chains building their own shelter catalogue in Australia. Custom colours, logo printing on devices and cabinets, branded cartons and manuals, custom carton inserts, multi-language documentation, and OEM programs from low four-figure unit quantities with a 30-day DOA replacement SLA per order.
3. Contractor and System Integrator Programs
For fire protection contractors, sprinkler contractors, system integrators and facility management groups in Perth running project pipelines. Project-matched device and hydraulic schedules, pre-assembled skid-mounted pump and valve sets, cause-and-effect logic pre-set at the factory, BACnet and Modbus register maps, cloud account provisioning, commissioning briefings for the first project, and spares allocation held against the project programme.
4. Cross-Border Trader and Sourcing Agent Programs
For trading companies, sourcing agents and import brokers in Perth and Australia seeking a reliable Chinese source factory for e-bike shelter fire suppression equipment. Complete export solutions: EXW, FOB, CIF and DDP shipping terms, T/T or L/C payment handling, HS code classification support, consolidated CE, RoHS, REACH, EN 12845 and NFPA 13 documentation, neutral or custom packaging, localized manuals, and commission-based or volume-based partnership structures for long-term trade cooperation. Global partners, export trading companies and local distributors are welcome to contact the Wanlin export desk for exclusive-territory discussion.
5. Housing, Municipal and Infrastructure Project Programs
For housing associations, municipal facility departments, transport operators, campus estates and public-building authorities in Perth running compliance programmes. Site-matched design, pilot installations, consolidated submission dossiers with the hydraulic calculation, crew training for the first commissioning, winterisation planning and a five-year spare-parts window with a documented obsolescence path across multi-year maintenance contracts.
A: Yes, and that is the most common starting point. A ball covers one to two metres, triggers only when the flame reaches its shell and discharges once; the Wanlin package covers about 20 m2 per rotating head, triggers from a camera at range and keeps water on the fire for the design duration. Most Perth partners keep the existing balls during the transition and remove them at the first annual service once the new system is commissioned and recorded.
A: Cameras follow the sightlines - typically one or two per shelter up to 100 m2, and one or two more per additional bay group so the fields of view overlap. Heads follow the floor area at roughly 20 m2 per rotating head, laid out on a drawn grid. The pump and tank follow the resulting flow and the design duration. We issue the indicative figures for budgeting and the full hydraulic calculation, pump curve and tank sizing after the site survey, and those are the numbers that go into the Australia submission.
A: That is the point of the wireless configuration. The camera, the control module and the valve talk over LoRaWAN, 4G Cat-1, NB-IoT or 433 MHz, so there is no cable run between them; battery and solar-powered modules remove the power run as well. Pipework to the heads still has to be fixed to the structure, but the floor is not opened and the store can usually stay in use through the works.
A: Where the mains gives sufficient pressure and flow, the system runs direct with a booster and a jockey pump. Where it does not, we size a tank and booster set from the hydraulic calculation - typically 6 to 10 m3 for a small residential store and 30 to 50 m3 for a multi-bay staff or fleet shelter, behind a 30-minute design duration. Tank level and riser pressure are reported to the dashboard so a loss of water is an alarm rather than a surprise.
A: Yes, with the right arrangement specified at design stage. Unheated shelters run dry pipe or pre-action with the control module and valve set in a freeze-protected enclosure or pump house; coastal and cold sites get corrosion-resistant trim, stainless or coated pipework and gasket sets matched to the environment. The trim is cycled through cold soak and salt-spray exposure at the factory and then operated before it ships.
A: EN 12845 design and installation reference with the hydraulic calculation, the EN 54 series for detection, control and signalling, NFPA 13, NFPA 72 and NFPA 855 documentation for the Americas, IEC 60364-7-722 and IEC 61851 wiring reference for the charging positions, CE marking under the Construction Products Regulation, UKCA for Great Britain, RoHS and REACH files, EAC, RCM and SASO and SABER support where the market requires it, plus ISO 9001 and ISO 14001 factory certification and calibration records per lot. Manuals ship in English, Arabic, Russian, Spanish, French, Portuguese, Indonesian, Urdu, Hindi, Vietnamese and Thai.
A: Sample cartons typically ship within 10-15 days and production project batches 28-35 days after approval. OEM and private-label programmes start from low four-figure unit quantities per model, and container-level mixed-model orders are quoted per destination. The suppression package and the WANLIN device family carry a 3-year limited warranty (2-year on instrumentation and on the tester body), a 12-month warranty on battery packs, 30-day DOA replacement, and a five-year spare-parts window with a documented obsolescence path for tenders that require a long service-life commitment in Australia.
A: Both, by design. We supply the contractor, the housing association or the developer directly where the schedule needs factory engineering, and we supply through the local distributor or importer who will carry the spares, the training and the warranty service afterwards. In practice the strongest programmes run together: the local partner holds the territory and the after-sales capability, and the factory holds the schedule, the hydraulic calculation and the engineering. Wanlin is recruiting local partners and does not appoint competing distributors in the same territory without discussion.
For wholesale pricing, sample carton requests, hydraulic calculation and sizing support, CE, RoHS, REACH, EN 12845 and NFPA 13 documentation, OEM and private-label customization, spares and consumables programs, and partnership discussions in Perth and Australia: